Services

Interior Fit-Outs

Office, retail and industrial interiors delivered on tenant deadlines, including work in occupied and after-hours buildings.

Browse all services

Fit-outs live or die on sequencing. Framing, mechanical, electrical, ceilings and finishes have to stack cleanly, and in an occupied building they have to do it inside someone else's operating hours.

Nights
Shift options in occupied buildings
0-14
Typical weeks for an office suite build-out
0
Superintendent responsible for your floor

What this covers

Occupied-building work

Night and weekend shifts, dust control and noise windows agreed with property management.

Landlord coordination

Base-building rules, elevator bookings and deposits handled by our team.

Trade sequencing

Framing, mechanical, electrical and finishes stacked to hit fixturing dates.

Punch discipline

Deficiency lists closed before your move-in crew arrives.

Included in the program

  • Office, professional and clinical suite build-outs
  • Retail and restaurant fixturing to brand standards
  • Demolition, framing, drywall, ceilings and millwork
  • Mechanical, electrical, sprinkler and life-safety modifications
  • Flooring, painting, glazing and specialty finishes

How it runs

  1. 01

    Landlord setup

    Base-building rules, deposits, insurance and elevator bookings arranged.

  2. 02

    Demolition and rough-in

    Strip-out, framing and mechanical-electrical rough-in with inspections booked ahead.

  3. 03

    Finishes

    Ceilings, millwork, flooring, glazing and paint on a locked sequence.

  4. 04

    Occupancy

    Inspections, deficiency closeout and handover for your furniture and IT crews.

Questions we get

Still unanswered? Call our office at (647) 360-5545 or send us the details.

Ask about Interior Fit-Outs
Can you work after hours?
Yes. Most of our occupied-building work runs evenings and weekends with the space presentable each morning.
Do you handle permits?
We prepare and submit the building permit application and manage inspections through occupancy.
Can you coordinate our furniture and IT vendors?
Yes — we schedule them into the closeout sequence so nobody is waiting on a floor that is not ready.

Need interior fit-outs at your site? Let's scope it.

See our projects