
Projects
Office Tower Lobby Modernization
A full lobby, security desk and elevator-cab renewal in a fully tenanted downtown tower, built almost entirely overnight.
Where office tower lobby modernization makes the difference
Night shifts
Work ran 8 pm to 5 am with the lobby presentable each morning.
Stone and glass
Large-format stone, feature lighting and frameless glass entries.
Life safety
Sprinkler, speaker and access-control revisions inspected in stages.
Result
No tenant complaint escalations through a 14-week program.



Included in the program
- Two-storey lobby, security desk and mail room
- Six elevator cab interiors and new fixtures
- New entrance vestibules and automatic doors
- Sprinkler, fire-alarm and access-control revisions
- Overnight schedule with daily clean turnovers
